Skip to content

PRODUCT

Scoping an MVPin two weeks.

Most MVPs are too big. A practical, two-week method to find the core loop of your product, cut everything else, and plan a first release that actually teaches you something.

  • Codesgenii team
  • 6 min read
  • 23 November 2026
On this page
  1. Why most MVPs are not minimum
  2. Days 1 to 3: find the core loop
  3. Days 4 to 6: name the riskiest assumption
  4. Days 7 to 10: design the smallest version
  5. Days 11 to 14: plan the first release
  6. What you should have at the end

Why most MVPs are not minimum

Founders usually arrive with a list of forty features and a budget for ten. The temptation is to squeeze all forty into a rushed build. The result is a product that does many things badly and teaches you very little. A minimum viable product has one job: to test your riskiest assumption as cheaply as possible.

Days 1 to 3: find the core loop

Write down the one thing a user must be able to do to get value, in a single sentence. For a booking app it might be: a customer finds an open slot and books it in under a minute. Everything that does not serve that sentence goes on a later list. Login screens, settings pages and admin dashboards can often be simpler than you think.

Days 4 to 6: name the riskiest assumption

Is the biggest risk that nobody wants this, that people want it but will not pay, or that it is hard to build? Each answer leads to a different first release. If demand is the risk, a landing page and a manual service might beat any code. If the technology is the risk, build a working prototype of that one hard piece first.

  • Cut every feature that does not test the assumption
  • Do things manually behind the scenes where you can
  • Decide in advance which result means go, change or stop

Days 7 to 10: design the smallest version

Sketch the screens for the core loop only, then turn them into a clickable prototype. Put it in front of five real users. You will learn more in those five sessions than in a month of internal debate, and changing a prototype costs hours, not weeks.

Days 11 to 14: plan the first release

Finish with a short, prioritised list, a realistic date and a budget. Add basic analytics so the release produces evidence instead of opinions. Then build in weekly releases, so you can still adjust direction while the money is being spent.

What you should have at the end

  • A one-sentence core loop everyone agrees on
  • The assumption your MVP will test, and how you will measure it
  • A clickable prototype tested with real users
  • A scoped build plan with a timeline and estimate

LET'S TALK

Have a problem worthsolving with software?

Tell us where you are and where you want to be. We reply within one business day. (placeholder)

Next step: discovery callYouDiscovery call